Abstract
In this manuscript, a control chart is designed for two-piece normal distribution using repetitive sampling. The necessary measures to determine the average run lengths for in control and out-of-control process are given. The average run lengths are presented for various specified parameters and shift constants. The efficiency of the proposed chart is compared with the existing control chart using single sampling. The application of the proposed chart is given with the help of an example.
Jun, C , Azam, M , Aslam, M & Rao, G (2021). A Control Chart Based on Two-piece Normal Distribution Using Repetitive Sampling. Afribary. Retrieved from https://tracking.afribary.com/works/a-control-chart-based-on-two-piece-normal-distribution-using-repetitive-sampling
Jun, Chi-Hyuck et. al. "A Control Chart Based on Two-piece Normal Distribution Using Repetitive Sampling" Afribary. Afribary, 01 May. 2021, https://tracking.afribary.com/works/a-control-chart-based-on-two-piece-normal-distribution-using-repetitive-sampling. Accessed 06 Nov. 2024.
Jun, Chi-Hyuck, Muhammad Azam , Muhammad Aslam and Gadde Rao . "A Control Chart Based on Two-piece Normal Distribution Using Repetitive Sampling". Afribary, Afribary, 01 May. 2021. Web. 06 Nov. 2024. < https://tracking.afribary.com/works/a-control-chart-based-on-two-piece-normal-distribution-using-repetitive-sampling >.
Jun, Chi-Hyuck , Azam, Muhammad , Aslam, Muhammad and Rao, Gadde . "A Control Chart Based on Two-piece Normal Distribution Using Repetitive Sampling" Afribary (2021). Accessed November 06, 2024. https://tracking.afribary.com/works/a-control-chart-based-on-two-piece-normal-distribution-using-repetitive-sampling