Adequate Power System Planning: A Necessity for an Improved Power System in Nigeria

ABSTRACT-Power system planning is a vast and important issue for operation and expansion of power delivery. One of the basic objectives of planning is to determine the right schedule for investment in new devices which ensures secure and economic power delivery for predicted customer demand. System planning also addresses the question of reliable and stable operation; hence reliability and stability analysis are also included in adequate power system planning studies. This work explores the adequate power system in Nigeria. It covers the three areas of system planning- generation, transmission and distribution planning and its necessity in improving power system in Nigeria. An overview of the power industry in Nigeria and its problem in actualizing an adequate power system planning is also treated.

Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

SYLVESTER, N. (2018). Adequate Power System Planning: A Necessity for an Improved Power System in Nigeria. Afribary. Retrieved from https://tracking.afribary.com/works/adequate-power-system-planning-a-necessity-for-an-improved-power-system-in-nigeria

MLA 8th

SYLVESTER, NDIBE "Adequate Power System Planning: A Necessity for an Improved Power System in Nigeria" Afribary. Afribary, 12 Mar. 2018, https://tracking.afribary.com/works/adequate-power-system-planning-a-necessity-for-an-improved-power-system-in-nigeria. Accessed 14 Nov. 2024.

MLA7

SYLVESTER, NDIBE . "Adequate Power System Planning: A Necessity for an Improved Power System in Nigeria". Afribary, Afribary, 12 Mar. 2018. Web. 14 Nov. 2024. < https://tracking.afribary.com/works/adequate-power-system-planning-a-necessity-for-an-improved-power-system-in-nigeria >.

Chicago

SYLVESTER, NDIBE . "Adequate Power System Planning: A Necessity for an Improved Power System in Nigeria" Afribary (2018). Accessed November 14, 2024. https://tracking.afribary.com/works/adequate-power-system-planning-a-necessity-for-an-improved-power-system-in-nigeria

Document Details
By: NDIBE SYLVESTER Field: Electrical Electronics Engineering Type: Project 59 PAGES (8050 WORDS) (pdf)