ABSTRACT
The 22.5 km2 Kobada project which is located in the Kangaba Cercle of the Koulikouro region of
Mali, is owned and operated by African Gold Group Inc. (AGG), a Canadian junior exploration
company (Fig. 1.1 shows perimeter for 22.5 km2; fig. 1.9 shows perimeter for consolidated
permit of 215 km2).
Notably the permit hosts a soil anomaly greater than 500 ppm arsenic that extends over 12 km of
strike length and one kilometre of width, which is offset to the west of extensive artisanal surface
saprolite and placer gold mining activity. Most importantly just about two kilometres of this
strike length host the Kobada gold zone referred to as “Kobada Zone 1” which has over 1.6
million oz (oxide) gold in 59.1 million tonnes grading 0.87 g/t at the 0.3 g/t cut-off and still
expanding in both directions along strike and at depth.
Historically, the major drilling direction in the Kobada zone 1 have been on azimuth 290⁰.
However recent structural investigations indicate that whilst the Kobada Shear Zone exhibits a
N20E (easterly dipping) strike, the mineralisation most actually occurs in quartz vein swarms
with an average strike orientation that is E-W (azimuth 190⁰-200⁰), confined within the
boundaries of the Kobada Shear Zone. There is an area in the northern most 400m of the current
resource where it is covered with drill information of both orientations by which the project sets
out to test which drilling direction will yield the most gold resource.
Gold mineralisation has been constrained by the development of wireframes modeled at a 0.2 g/t
Au lower cut-off grade at an average dip of 74o respectively for both drilling directions.
For subsequent analysis and estimation, two geostatistical domains, the saprolite (modelled at an
average dip of 74o ) and the duricrust domain (a roughly flat lying horizontal hard pan on top of
the saprolite) have been used.
vii
Variography was completed on the 2m composite for the duricrust and saprolite domains for
each drilling direction.
Using the ordinary kriging methodology, drilling to the west is relatively continuous and
hence more viable than drilling south, with the west yielding in excess of 15,000 ounces
more in the various respective grade cut offs.
Geological and structural models have been recommended as well as closing in the drill
spacing to help establish more confidence in the resource estimate.
NKANSAH, J (2021). Evaluation Of Kobada North Gold Resource, Mali, Using Two Different Drill Directions. Afribary. Retrieved from https://tracking.afribary.com/works/evaluation-of-kobada-north-gold-resource-mali-using-two-different-drill-directions
NKANSAH, JAMES "Evaluation Of Kobada North Gold Resource, Mali, Using Two Different Drill Directions" Afribary. Afribary, 19 Apr. 2021, https://tracking.afribary.com/works/evaluation-of-kobada-north-gold-resource-mali-using-two-different-drill-directions. Accessed 22 Nov. 2024.
NKANSAH, JAMES . "Evaluation Of Kobada North Gold Resource, Mali, Using Two Different Drill Directions". Afribary, Afribary, 19 Apr. 2021. Web. 22 Nov. 2024. < https://tracking.afribary.com/works/evaluation-of-kobada-north-gold-resource-mali-using-two-different-drill-directions >.
NKANSAH, JAMES . "Evaluation Of Kobada North Gold Resource, Mali, Using Two Different Drill Directions" Afribary (2021). Accessed November 22, 2024. https://tracking.afribary.com/works/evaluation-of-kobada-north-gold-resource-mali-using-two-different-drill-directions