Abstract
Integrating Administrative and Engineering Sciences, It has
profound effect in Enriching both for the good of mankind, As
the value management Approach depends on the Organization
of Scientific Steps in order to reach the point of balance between
quality, cost and time ,Which invited engineers to exploit and
apply this approach during the different phases of the project to
achieve this balance in all aspects of technical and
administrative project in general.
And the Proportion of high costs of operational stations
hydrologic ,it came in this study, and therefore exposed to this
research in the first part of the partial theoretical concepts and
definitions of curriculum value management, quality, cost, time
and any stages of the appropriate project for the application of
curriculum management value during the life of the projects.
This study deals with the theoretical part and the concepts and
definitions of the methodology of managing the value, quality,
cost, time and any stages of the project suitable for applying the
value management approach during the life of the projects.
One of the main objectives of this study is to find a good
process useful raise quality and reduce cost at the same time for
projects engineering solutions. In addition to finding alternative
solutions for the operation of hydrological stations.
The researcher chose the analytical study One of the phases of
the implementation of value management and specifically the
stages after the end of the project and specifically (the stage of
operation of the project) With the aim of selecting and
developing alternatives to the process of operation of the
stations hydrometric) hydrologic (check the required function
and quality and high efficiency Atalha decision makers and is
also compatible with the total cost of the project budget
operational and concluded a preliminary report of the study of
the value of which explains ideas and proposals that can help in
achieving the same function required.
But by a significant saving in total cost, it reaches 42% of the
current cost of operation in addition to reducing the time and
increase in quality.He Studies Concluded that the findings and
recommendations urging in the first place to consider
curriculum value management style thinking and behavior
pattern of my life and not only the stage of engineering projects. this
research in the first part of the partial theoretical concepts and
definitions of curriculum value management, quality, cost, time
and any stages of the appropriate project for the application of
curriculum management value during the life of the projects.
This study deals with the theoretical part and the concepts and
definitions of the methodology of managing the value, quality,
cost, time and any stages of the project suitable for applying the
value management approach during the life of the projects.
One of the main objectives of this study is to find a good
process useful raise quality and reduce cost at the same time for
projects engineering solutions. In addition to finding alternative
solutions for the operation of hydrological stations.
The researcher chose the analytical study One of the phases of
the implementation of value management and specifically the
stages after the end of the project and specifically (the stage of
operation of the project) With the aim of selecting and
developing alternatives to the process of operation of the
stations hydrometric) hydrologic (check the required function
and quality and high efficiency Atalha decision makers and is
also compatible with the total cost of the project budget
operational and concluded a preliminary report of the study of
ز
the value of which explains ideas and proposals that can help in
achieving the same function required.
But by a significant saving in total cost, it reaches 42% of the
current cost of operation in addition to reducing the time and
increase in quality.He Studies Concluded that the findings and
recommendations urging in the first place to consider
curriculum value management style thinking and behavior
pattern of my life and not only the stage of engineering projects. not only the stage of engineering projects.
Ochega, H. (2021). Evaluation of the Operation system for the hydrometric Measurement stations using Value Engineering. Afribary. Retrieved from https://tracking.afribary.com/works/evaluation-of-the-operation-system-for-the-hydrometric-measurement-stations-using-value-engineering
Ochega, Helen "Evaluation of the Operation system for the hydrometric Measurement stations using Value Engineering" Afribary. Afribary, 20 May. 2021, https://tracking.afribary.com/works/evaluation-of-the-operation-system-for-the-hydrometric-measurement-stations-using-value-engineering. Accessed 22 Nov. 2024.
Ochega, Helen . "Evaluation of the Operation system for the hydrometric Measurement stations using Value Engineering". Afribary, Afribary, 20 May. 2021. Web. 22 Nov. 2024. < https://tracking.afribary.com/works/evaluation-of-the-operation-system-for-the-hydrometric-measurement-stations-using-value-engineering >.
Ochega, Helen . "Evaluation of the Operation system for the hydrometric Measurement stations using Value Engineering" Afribary (2021). Accessed November 22, 2024. https://tracking.afribary.com/works/evaluation-of-the-operation-system-for-the-hydrometric-measurement-stations-using-value-engineering