Modeling the Supply of Pipe Borne Water in Ilorin

ABSTRACT

Water as an essential commodity plays a major role in national development, the availability of water through pipe borne to individual, communities, and the country at large will help in achieving the New Millennium Development Goal (MDG7), hence the constant study, analysis and forecast for  supply of water using past water supplied. The supply of pipe borne water from 2009 to 2015 was examined with the aim of developing a working model to forecast future supply of pipe borne water. All these were achieved using the Box-Jenkins methodology. The Box-Jenkins methodology is a statistical tool that is adequate for the forecasting of time series data. However, before the Box-Jenkins methodology, time plot was plotted to know the components that are present in the supply of pipe borne water in Ilorin, from the graph plotted it was noticed that irregularity and upward trend were the components present with the absent of seasonal and cyclical variations in the series. The series was not stationary but was made stationary after the first difference, Augmented Dickey Fuller Unit Root test was used to confirm the stationarity of the series. After stationarity was established, the model of the supply of pipe borne water was determined using the correlogram and it was suspected that the model was an Autoregressive Integrated Moving Average model. The order of the models and parameter of the models were confirmed from the information criterion computation and it was discovered with ARIMA(0,1,1), ARIMA(0,1,0) and ARIMA(1,1,0). The adequacy of the models was also checked and they were found to be adequate from a series of test like analysis of residual using qq-plot. The best model was picked using the AIC, BIC and HQIC, ARIMA(0,1,0) had the relatively lowest AIC, BIC and HQIC. Therefore, we concluded that our best model is ARIMA(0,1,0). Using the model developed, the supply of pipe borne water for a period of 24 months was forecasted and it was discovered that it follows a slight upward movement. The study concludes that though the forecast proves to be moving upward with time, continuous measures should be carried out so as to check for any decrease in the supply of water in the state.

TABLE OF CONTENTS   

                                                                                                                       PAGE

Title Pagei           

Attestation        ii

Certification         iii

Dedicationiv

Acknowledgement          v

Abstract            viii


CHAPTER ONE:INTRODUCTION 

1.1Background to the Study1               

1.2Study Area1          

1.3Definition of Water4                                                                                                     

1.4Pipe Borne Water            5                                                                                                   

1.5Pipe Borne Water in Kwara7                                                                                          

1.6Water Related Diseases  8                                                                                                         

1.7Challenges of Pipe Borne Water  

1.8Effect of Pipe Borne Water

1.9Aim and Objectives 8                                                                                                                    

1.10Source of Data

1.11Justification

1.12Organization of Study 9                                                                                              

CHAPTER TWO:LITERATURE REVIEW 

2.1Conceptual Framework10                                                               

2.2Options for Water Problem Solution11

CHAPTER THREE:  METHODOLOGY                                                                 

3.0Time Series as a Stochastic Process 11                                     3.1Introduction12                                           

      Types of Time Series`12                                                          

      Importance of Time Series21                                                    

3.4Components of Time Series 22                                                                                      

3.5Box-Jenkins Methodology23                                                                                                                

3.5.1Advantages of Box-Jenkins Methodology23                                                                                       

3.5.2Disadvantages of Box-Jenkins Methodology24                                                        

3.5.3Summary of Box-Jenkins Methodology25                                         

3.6Identification Procedure25                                   

3.7Autocorrelation Functions25                                                 

3.8The Partial Autocorrelation Function26                                                                                   

3.9Stationary and Non-Stationary Process26        

3.10Test for Stationary Series27                                                                                  

3.11Removal of Trend and Ensuring Stationarity28                                              

3.12Identifying a Tentetive Model   29     

2.19Stationary and Non Stationary Processes   30                                         

2.20Test for Stationary Series     30                                                                    

2.21Removal of Trend and Ensuring Stationarity 31                                      

2.22Identifying a Tentative Model     32                                                      

2.23Autoregressive, AR (p) Process            32                                               

2.24Moving Average, MA (q) Process    33                                                   

2.25Autoregressive Moving Average ARMA (p, q) Process        34

2.26Model and Model Order Determination       34                                      

2.27Autoregressive Models   34                                                                              

2.28Moving Average Model35                                                                                     

2.29Autoregressive Moving Average Model  35                                               

2.30Information Criteria   35                                                                                            

2.31Akaike Information Criterion (AIC) 36                                            

2.32Bayesian Information Criterion (BIC)36

2.33Corrected Akaike Information Criterion (AICC)  37                                                     

2.34Diagnostic Checking   37                                                                                            

2.35Forecasting                    38                                                                                             


CHAPTER THREE:ANALYSIS AND INTERPRETATIONS OF 

RESULT                                               39

CHAPTER FOUR: CONCLUSIONS AND RECOMMENDATIONS            51

References            53                                                                      

Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Oluwatobi, S. (2018). Modeling the Supply of Pipe Borne Water in Ilorin. Afribary. Retrieved from https://tracking.afribary.com/works/modeling-the-supply-of-pipe-borne-water-in-ilorin

MLA 8th

Oluwatobi, Shotunde "Modeling the Supply of Pipe Borne Water in Ilorin" Afribary. Afribary, 27 Nov. 2018, https://tracking.afribary.com/works/modeling-the-supply-of-pipe-borne-water-in-ilorin. Accessed 27 Nov. 2024.

MLA7

Oluwatobi, Shotunde . "Modeling the Supply of Pipe Borne Water in Ilorin". Afribary, Afribary, 27 Nov. 2018. Web. 27 Nov. 2024. < https://tracking.afribary.com/works/modeling-the-supply-of-pipe-borne-water-in-ilorin >.

Chicago

Oluwatobi, Shotunde . "Modeling the Supply of Pipe Borne Water in Ilorin" Afribary (2018). Accessed November 27, 2024. https://tracking.afribary.com/works/modeling-the-supply-of-pipe-borne-water-in-ilorin