ABSTRACT
TABLE OF CONTENTS
CHAPTER ONE
INTRODUCTION
1.1 Background of the Study
1.2 Statement of the Research Problem
1.3 Research Objectives
1.3.1 General Objective
1.3.2 Specific Objectives
1.4 Research Questions
1.5 Significance of the study
1.6 Scope and limitation of the study
1.6.1. Limitation of the study
1.7. Organisation of the Study
CHAPTER TWO
LITERATURE REVIEW
2.1.contracts
3 2.2. Construction contract
2.3. Element of a contracts
2.4. The majority of road construction challenge
2.4.1. Construction planning, administration, and management
2.4.2. Construction contracts methods
2.4.3. Types of construction contracts
2.5. Condition of Contracts for Construction: An assessment of the challenges in conditions of contract management issue in roads construction projects at DDCARA, Ethiopia. 2023G.C
2.6. Challenges of Contract Management
2.7. Roles and Responsibilities of parties of a Construction Contract2.8. Contract administration
2.9. General conditions of a contract/contract form/
2.10. Project and Project Management
2.11. Contract Management
2.12. Contract Management Theories
2.12.1. Contract Compliance Theory
2.12.2. Contract Management Theory
2.12.3. The Principal-Agency Theory
2.124. The Will Theory
2.13. The Contract Management Process
2.13.1. Establishing the form of Contract
2.13.2. Terms and Conditions of Good Contracts
2.13.3. Empirical Literature Review
2.14. Contract Conditions and Price Adjustment Clauses
2.15. Research gap identification
41 CHAPTER THREE
RESEARCH METHODOLOGY
3.1 Introduction
3.2 . Study Area
3.3. Study Population
3.4. Study type
3.4.1. Study Design
3.5 Sampling Procedure, Frame, Unit and Procedures
3.6 Description Variables
3.6.1. Dependent variable
4 An assessment of the challenges in conditions of contract management issue in roads construction projects at DDCARA, Ethiopia. 2023G.C
3.6.2. Independent variable
3.7 Methods of Data Collection
3.8. Ethical Consideration
3.9. Expected Outcomes
3.10 Data Processing and Analysis
CHAPTER 4 WORK PLAN
CHAPTER 5 BUDGET OF THE PROJECT
REFERENCES
Adem, A. & Hussein, A (2024). Proposal on: An Assessment of Challenges in Conditions of Contract Management Issue in Roads Construction Projects at Dire Dawa City Road Authority, Ethiopia. Afribary. Retrieved from https://tracking.afribary.com/works/proposal-for-ahmed23-final
Adem, Ahmed, and Ahmed Hussein "Proposal on: An Assessment of Challenges in Conditions of Contract Management Issue in Roads Construction Projects at Dire Dawa City Road Authority, Ethiopia" Afribary. Afribary, 05 Feb. 2024, https://tracking.afribary.com/works/proposal-for-ahmed23-final. Accessed 22 Dec. 2024.
Adem, Ahmed, and Ahmed Hussein . "Proposal on: An Assessment of Challenges in Conditions of Contract Management Issue in Roads Construction Projects at Dire Dawa City Road Authority, Ethiopia". Afribary, Afribary, 05 Feb. 2024. Web. 22 Dec. 2024. < https://tracking.afribary.com/works/proposal-for-ahmed23-final >.
Adem, Ahmed and Hussein, Ahmed . "Proposal on: An Assessment of Challenges in Conditions of Contract Management Issue in Roads Construction Projects at Dire Dawa City Road Authority, Ethiopia" Afribary (2024). Accessed December 22, 2024. https://tracking.afribary.com/works/proposal-for-ahmed23-final