ABSTRACT
This report is based on my six months Student Industrial Work Experience Scheme undertaken at Department Of Development Control, Abuja Metropolitan Management Council, No 2 Juba Street, Wuse Zone 6, Abuja, F.C.T.
The information I was able to gather was basically through my personal involvement in the activities going on in the site office where I was posted, as well as from observations and personal interviews of my bosses, supervisors and senior colleagues, and also through some secondary sources such as; textbooks, magazines and journals.
The department is a governmental institution saddled with the responsibility of ensuring that the land use plan as prepared in the Master Plan review of June 2008 by Albert Speers & Partner GmbH is followed to the latter. The department also specializes in the approval of building plans, preparation of development plans and layout schemes, conduct of environmental impact assessment and baseline studies, Preparation of resettlement scheme and urban regeneration plan, conduct of landuse mapping and infrastructural planning, town planning advocacy and issuance of development permit.
The student’s industrial work experience scheme (SIWES) is a scheme designed for students in the penultimate year to acquire some practical experiences in line with their courses of study, thereby preparing them for the jobs they may take up after the completion of their studies.
ALLE, A. (2018). SIWES I. T report undertaken at the department of development control wuse zone 6,Abuja.. Afribary. Retrieved from https://tracking.afribary.com/works/siwes-i-t-report-undertaken-at-the-department-of-development-control-wise-zone-6-abuja-876
ALLE, ADEOLA "SIWES I. T report undertaken at the department of development control wuse zone 6,Abuja." Afribary. Afribary, 29 Jan. 2018, https://tracking.afribary.com/works/siwes-i-t-report-undertaken-at-the-department-of-development-control-wise-zone-6-abuja-876. Accessed 09 Nov. 2024.
ALLE, ADEOLA . "SIWES I. T report undertaken at the department of development control wuse zone 6,Abuja.". Afribary, Afribary, 29 Jan. 2018. Web. 09 Nov. 2024. < https://tracking.afribary.com/works/siwes-i-t-report-undertaken-at-the-department-of-development-control-wise-zone-6-abuja-876 >.
ALLE, ADEOLA . "SIWES I. T report undertaken at the department of development control wuse zone 6,Abuja." Afribary (2018). Accessed November 09, 2024. https://tracking.afribary.com/works/siwes-i-t-report-undertaken-at-the-department-of-development-control-wise-zone-6-abuja-876