The Study talks about the challenges of implementing telecommunications
projectsin Sudan through four chapters: project selection, selection of the team, the
organization and the impact and influence of external factors. And that with
modern references and that the importance of these factors in the field of
accelerating communications.
Which it should be referred to the detailed study for the (Phase-H Networks
Expansion Project) as main activities:
 Network Design &Planning
 Site Survey
 Site Selection and Validation
 Site Acquisition
 Soil investigation
 Site Design and Development
 Site Construction
 Installation and Commissioning
 Acceptance and Integrations (site on air stage).
During the study we have enough space about the inflation event 2012 in Sudan,
with complex and multi-dimensional and compound impact. Which has an
important role in rising costs?
The project contractors rejected to continue the work until PMO, Sudatel Group
increase the remaining work 25%.
For innovative solutions to the problems facing us and the importance of this
project has been our intention from which, contrary to what has been set of
procedures and quality in order to be given to those who are knocking on the field.
We use Sand Modeling Foundation (SMF) Tower for temporary sites and areas
that have difficulty to transport materials.
The information and documents selected and revised for those who need to go
forward in this field.
Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Imam, M (2021). The Challenges Of Implementing Telecommunication Projects In Sudan-A Case Study Phase-H Network Expansion Project. Afribary. Retrieved from https://tracking.afribary.com/works/the-challenges-of-implementing-telecommunication-projects-in-sudan-a-case-study-phase-h-network-expansion-project

MLA 8th

Imam, Mohammed "The Challenges Of Implementing Telecommunication Projects In Sudan-A Case Study Phase-H Network Expansion Project" Afribary. Afribary, 19 May. 2021, https://tracking.afribary.com/works/the-challenges-of-implementing-telecommunication-projects-in-sudan-a-case-study-phase-h-network-expansion-project. Accessed 10 Nov. 2024.

MLA7

Imam, Mohammed . "The Challenges Of Implementing Telecommunication Projects In Sudan-A Case Study Phase-H Network Expansion Project". Afribary, Afribary, 19 May. 2021. Web. 10 Nov. 2024. < https://tracking.afribary.com/works/the-challenges-of-implementing-telecommunication-projects-in-sudan-a-case-study-phase-h-network-expansion-project >.

Chicago

Imam, Mohammed . "The Challenges Of Implementing Telecommunication Projects In Sudan-A Case Study Phase-H Network Expansion Project" Afribary (2021). Accessed November 10, 2024. https://tracking.afribary.com/works/the-challenges-of-implementing-telecommunication-projects-in-sudan-a-case-study-phase-h-network-expansion-project