Topographical Surveying of Government Technical Collage Idah Kogi State

ABSTRCT

This project aimed purposely at the production of topographic plan of Government technical college idah Kogi State. The following surveying methods are carried out to achieve this project. A reconnaissance surveying of the area to be survey was carried out before other topographical surveying method was carried out total station traversing for coordinating of the station was carried out leveling which is purposely aimed at determining the deference in spot height after which the topographical map was produced at the scale of 1:5,000, this plan would be immense value as would be suit for the designing and planning of the infrastructural developing of the study area such as roads, building a clear image of the surface of the ground, topographical. Conventionally should land configuration by means of contour lines.


 

TABLE OF CONTENT

Title Page

Certification

Dedication

Acknowledgement

Abstract

Table of Content

CHAPTER ONE: INTRODUCTION

1.1             Aim Of The Study

1.2             Objective Of The Studies

1.3             Significant Of The Project

1.4             Limitation Of The Study

1.5             Scope Of The Study

1.6             Study Area

1.7             Date And Duration Of The Project

1.8             Project Order And Specification

1.9             Level Pf Participation

 

CHAPTER TWO: PROJECT PLANNING

2.1     Data Search

2.2     Instrument Test

2.3     Instrumentation

2.4    Temporary Adjustment

2.6     Field Reconnaissance

2.7     Verification of Controls (In Situ Check)

2.8     Computation of Data from Coordinate Values

2.9 Selection of Station

2.10   Documentation

2.11 Data Sources

2.12 Secondary Data Source

2.13   Primary Data Source

CHAPTER THREE: DATA ACQUISITION 

3.1 Spatial Data Acquisition

3.2 Total Station Traversing By Direct Coordination Technique.

3.3   Spot Heightening: The Procedures Were:

3.4    Detailing

CHAPTER FOUR: DATA PROCESSING

4.1     Forward Computation

4.2     Back Computation

4.3     Area Computation

4.4   Abstraction of Data

4.5     Analysis of Result

4.6.1   Analysis of Linear Errors

4.6.2     Analysis of Elevation Closure

4.6.3     Analysis of Linear Accuracy

4.7     Map Production

CHAPTER FIVE: PROBLEMS ENCOUNTERED, PRECAULTION TAKEN RECOMMENDATION AND CONCLUSION

5.1     Problem Encountered

5.2     Precaution Taken

5.3     Recommendation

5.4     Conclusion

          References

          Appendices

Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Research, A. & DAMILOLA, I (2020). Topographical Surveying of Government Technical Collage Idah Kogi State. Afribary. Retrieved from https://tracking.afribary.com/works/topographical-surveying-of-government-technical-collage-idah-kogi-state

MLA 8th

Research, Afri, and IBIKUNLE DAMILOLA "Topographical Surveying of Government Technical Collage Idah Kogi State" Afribary. Afribary, 11 Sep. 2020, https://tracking.afribary.com/works/topographical-surveying-of-government-technical-collage-idah-kogi-state. Accessed 12 Nov. 2024.

MLA7

Research, Afri, and IBIKUNLE DAMILOLA . "Topographical Surveying of Government Technical Collage Idah Kogi State". Afribary, Afribary, 11 Sep. 2020. Web. 12 Nov. 2024. < https://tracking.afribary.com/works/topographical-surveying-of-government-technical-collage-idah-kogi-state >.

Chicago

Research, Afri and DAMILOLA, IBIKUNLE . "Topographical Surveying of Government Technical Collage Idah Kogi State" Afribary (2020). Accessed November 12, 2024. https://tracking.afribary.com/works/topographical-surveying-of-government-technical-collage-idah-kogi-state

Document Details
By: Afri Research IBIKUNLE .V. DAMILOLA Field: Quantity Surveying Type: Project 19 PAGES (4744 WORDS) (docx)