The successful execution of the project is expected to have both positive and negative impact on the physical, chemical and biological environment of the site for the proposed solar farm. Consequently, d-ExcelChris Renewable Energy Limited has been consulted to prepare a Preliminary ESIA in line with the World Bank Standard, Operational Performance Standards and International Finance Corporation (IFC), and also the national and local regulations. The national regulation which is Nigerian EIA ...