Remote areas that are not within the maximum breakeven grid extension distance limit will not be economical or feasible for grid connections to provide electrical power to the community (remote area). An integrated autonomous sustainable energy system is a feasible option. We worked on a novel multi optimization electrical energy assessment/power management system of a microgrid network that adopted combined dispatch, load-following, and cycle-charging strategies (control system) that acted a...
The research works is to examine the impact of top management team and market information in manufacturing industries (A Case Study of Nestle Nig. Plc.). For the purpose of this study, the researchers has identified the problem formulated the research questions and hypothesis, research design through the use of structured questionnaires. In order to answer the research question and achieve the objective of the study, the following hypotheses are stipulated:There is no cordial relationship b...
Privacy Policy | Refund Policy | Terms | Copyright | © 2024, Afribary Limited. All rights reserved.