Abstract
Time is recently the critical element in standardizing productivity, profits
and salaries and consequently important for the accomplishment of business, the
activities related to schemes, performance of the required tasks according to
specific standard times, for this, the need to study the problem of performing the
required tasks (performance Level) in the planned time in order to promote the
companies working in the field of construction to the highest levels of
performance by measuring the impact of time factors(time planning ,Time
organizing, time guidance, time control)
On the level of performance among workers, the study aimed to clarify the
importance of time in the project and the basic variables in construction projects,
the study also aimed to clarify the impact of time on workers, and whether project
directorates is careful to highlight the importance of time, to achieve this
objective, the researcher ran a field study on contractor engineers interested in
construction sector, consultants and project managers and others, as the
researcher has developed a questionnaire that included questions enveloping six
basic pivots ,each of which covers an element of time elements in addition to time
control and productivity. The researcher used (Kolmogorov Smirnov)test in the
analysis of the study and testing of hypotheses, to assure the natural distribution
of data and arithmetic averages and standard deviations ,multi- sloping and
simple sloping.
The study reached to results such as: there is an outstanding impact of time
elements on the performance of workers in construction sectors. The study also
revealed the high impact of time control on productivity; the study also explained
that determination of priorities is an important factor in project time control,
referring to workers’ performance level, it was proved the knowledge about the
factors of impact in deterioration of workers’ performance in construction sectors
on treating the deviation in project performance time schedule in order to promote
workers’ performance.
The study has come out with some recommendations such as: training
courses for workers in construction sector should be held in the sphere of
construction projects time control, and care should be given to the workers spiritual power.
AK, A. (2021). The Effect Of Time Management On Employees Performance Level On Construction Sector. Afribary. Retrieved from https://tracking.afribary.com/works/the-effect-of-time-management-on-employees-performance-level-on-construction-sector
AK, Aakanksha "The Effect Of Time Management On Employees Performance Level On Construction Sector" Afribary. Afribary, 19 May. 2021, https://tracking.afribary.com/works/the-effect-of-time-management-on-employees-performance-level-on-construction-sector. Accessed 21 Nov. 2024.
AK, Aakanksha . "The Effect Of Time Management On Employees Performance Level On Construction Sector". Afribary, Afribary, 19 May. 2021. Web. 21 Nov. 2024. < https://tracking.afribary.com/works/the-effect-of-time-management-on-employees-performance-level-on-construction-sector >.
AK, Aakanksha . "The Effect Of Time Management On Employees Performance Level On Construction Sector" Afribary (2021). Accessed November 21, 2024. https://tracking.afribary.com/works/the-effect-of-time-management-on-employees-performance-level-on-construction-sector